MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | T/T |
Supply Capacity: | 120-150 Sets Molds |
Specification | Details |
---|---|
Mould Name | OEM Light Truck SMC Compression Molding Front Bumper FRP Compression Moulding |
Material | SMC |
Steel For Cavity & Core | 1.2344 |
Mould Base | S50c |
NOs. of Cavity | 1*1 |
Surface | Chrome |
Heating option | Thermal oil heating |
Mould Standard | HASCO |
Press Machine | 850T |
Mould Lifetime | 500,000pcs |
Mould manufacturer Time | 35 days |
The displayed pictures are for reference only. We can manufacture various types of SMC, BMC, and GMT compression molds according to customer requirements.
UTrust Mould specializes in manufacturing various compression moulds including SMC moulds, BMC moulds, and GMT moulds. With years of experience, we've completed over 30 sets of SMC mould orders annually for clients in Australia, Holland, Russia, UK, and more.
1 | Years of design experience with professional designers and skilled workers ensuring quality |
2 | Strong production capacity of 200-300 sets per year with on-time delivery |
3 | Own plastic mould workshop ensuring quality control |
4 | Excellent communication with weekly progress reports including detailed photos |
5 | Supply both plastic moulds and rapid prototypes |
6 | Provide low-volume production to ensure mould quality before shipment |
Supplier | Country | Steel Number |
---|---|---|
FINKL | USA | P20, H13 |
Assab | Sweden | S136, S136H, 718H |
DAIDO | Japan | NAK80, SKD61, PX5 |
Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
We have a professional QC team to control mold quality from raw material selection through machining to final mold testing. We understand that quality control is essential for successful business operations and that quality is the life of our enterprise.
For most molds, the standard lead time is 45 to 60 working days (excluding Chinese official holidays) after receiving the deposit and approving the mold drawings.
1) You can visit our factory to observe mold testing directly.
2) We can send samples via DHL, TNT, or Fedex, along with mold running videos and molding parts dimension inspection reports by email.
We offer 1-year warranty under normal use conditions. Non-man-made damaged spare parts will be provided free within one year. You can contact us anytime for assistance.
For new SMC/BMC/GMT compression mould projects, please send your 2D/3D drawings or sample pictures with complete dimensions. We will respond promptly.
![]() |
MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | T/T |
Supply Capacity: | 120-150 Sets Molds |
Specification | Details |
---|---|
Mould Name | OEM Light Truck SMC Compression Molding Front Bumper FRP Compression Moulding |
Material | SMC |
Steel For Cavity & Core | 1.2344 |
Mould Base | S50c |
NOs. of Cavity | 1*1 |
Surface | Chrome |
Heating option | Thermal oil heating |
Mould Standard | HASCO |
Press Machine | 850T |
Mould Lifetime | 500,000pcs |
Mould manufacturer Time | 35 days |
The displayed pictures are for reference only. We can manufacture various types of SMC, BMC, and GMT compression molds according to customer requirements.
UTrust Mould specializes in manufacturing various compression moulds including SMC moulds, BMC moulds, and GMT moulds. With years of experience, we've completed over 30 sets of SMC mould orders annually for clients in Australia, Holland, Russia, UK, and more.
1 | Years of design experience with professional designers and skilled workers ensuring quality |
2 | Strong production capacity of 200-300 sets per year with on-time delivery |
3 | Own plastic mould workshop ensuring quality control |
4 | Excellent communication with weekly progress reports including detailed photos |
5 | Supply both plastic moulds and rapid prototypes |
6 | Provide low-volume production to ensure mould quality before shipment |
Supplier | Country | Steel Number |
---|---|---|
FINKL | USA | P20, H13 |
Assab | Sweden | S136, S136H, 718H |
DAIDO | Japan | NAK80, SKD61, PX5 |
Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
We have a professional QC team to control mold quality from raw material selection through machining to final mold testing. We understand that quality control is essential for successful business operations and that quality is the life of our enterprise.
For most molds, the standard lead time is 45 to 60 working days (excluding Chinese official holidays) after receiving the deposit and approving the mold drawings.
1) You can visit our factory to observe mold testing directly.
2) We can send samples via DHL, TNT, or Fedex, along with mold running videos and molding parts dimension inspection reports by email.
We offer 1-year warranty under normal use conditions. Non-man-made damaged spare parts will be provided free within one year. You can contact us anytime for assistance.
For new SMC/BMC/GMT compression mould projects, please send your 2D/3D drawings or sample pictures with complete dimensions. We will respond promptly.