MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | 50% deposit,with the balance payable by wire transfer before delivery. |
Supply Capacity: | 120-150 + sets + per quarterly |
Attribute | Value |
---|---|
Mold Type | Compression mold |
Product Material | SMC |
Cavity | Single-cavity |
Heating System | Oil |
Customized | Customized |
Structure | According to Your Drawing/Sample |
Warranty Period | 1 Year |
Origin | China |
Production Capacity | 30 Sets/Month |
Material | P20 |
Demoulding | Automatic |
Mould Life | 300000-1000000 shots |
Warranty | 1 Year |
Lead Time | 60-90 Days |
Transport Package | Wooden Case |
HS Code | 8480719090 |
Design Software | UG, PROE, CAD, CATIA, SOLIDWORKS |
Heat Treatment | Nitriding |
Mould Design Time | 7 days |
Machine Equipment | CNC, EDM, Wire cutting machine, Drilling machine |
Mould Operation | Full automaticity |
MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | 50% deposit,with the balance payable by wire transfer before delivery. |
Supply Capacity: | 120-150 + sets + per quarterly |
Attribute | Value |
---|---|
Mold Type | Compression mold |
Product Material | SMC |
Cavity | Single-cavity |
Heating System | Oil |
Customized | Customized |
Structure | According to Your Drawing/Sample |
Warranty Period | 1 Year |
Origin | China |
Production Capacity | 30 Sets/Month |
Material | P20 |
Demoulding | Automatic |
Mould Life | 300000-1000000 shots |
Warranty | 1 Year |
Lead Time | 60-90 Days |
Transport Package | Wooden Case |
HS Code | 8480719090 |
Design Software | UG, PROE, CAD, CATIA, SOLIDWORKS |
Heat Treatment | Nitriding |
Mould Design Time | 7 days |
Machine Equipment | CNC, EDM, Wire cutting machine, Drilling machine |
Mould Operation | Full automaticity |