MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | 50% deposit,with the balance payable by wire transfer before delivery. |
Supply Capacity: | 120-150 + sets + per quarterly |
SMC automotive part mould with comprehensive manufacturing capabilities and quality assurance.
Product Name | Splash Guard Car Parts Mould Auto Guard Compression Mould Single Cavity |
---|---|
Product material | SMC |
Core & Cavity Steel | 2738 |
Steel hardness | HRC34-38 |
Mould Standard | DME |
Cavity Number | SINGLE |
Ejector System | Ejector pin+oil cylinder |
Cycle Time | 30-35S |
Tooling lead time | 60DAYS |
Mould life | 500,000 SHOTS |
Quality assurance | ISO9001 |
We specialize in various compression moulds including SMC, BMC, and GMT moulds for diverse applications:
Mould Steel Supplier | Country | Steel Number |
---|---|---|
FINKL | USA | P20, H13 |
Assab | Sweden | S136, S136H, 718H |
DAIDO | Japan | NAK80, SKD61, PX5 |
Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
We maintain professional QC team to monitor quality from raw materials through final testing, understanding that quality is fundamental to successful business operations.
Standard lead time is 45-60 working days (excluding Chinese holidays) after deposit receipt and drawing approval.
1-year warranty under normal use. Free spare parts for non-manual damage within warranty period. Continuous technical support available.
MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | 50% deposit,with the balance payable by wire transfer before delivery. |
Supply Capacity: | 120-150 + sets + per quarterly |
SMC automotive part mould with comprehensive manufacturing capabilities and quality assurance.
Product Name | Splash Guard Car Parts Mould Auto Guard Compression Mould Single Cavity |
---|---|
Product material | SMC |
Core & Cavity Steel | 2738 |
Steel hardness | HRC34-38 |
Mould Standard | DME |
Cavity Number | SINGLE |
Ejector System | Ejector pin+oil cylinder |
Cycle Time | 30-35S |
Tooling lead time | 60DAYS |
Mould life | 500,000 SHOTS |
Quality assurance | ISO9001 |
We specialize in various compression moulds including SMC, BMC, and GMT moulds for diverse applications:
Mould Steel Supplier | Country | Steel Number |
---|---|---|
FINKL | USA | P20, H13 |
Assab | Sweden | S136, S136H, 718H |
DAIDO | Japan | NAK80, SKD61, PX5 |
Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
We maintain professional QC team to monitor quality from raw materials through final testing, understanding that quality is fundamental to successful business operations.
Standard lead time is 45-60 working days (excluding Chinese holidays) after deposit receipt and drawing approval.
1-year warranty under normal use. Free spare parts for non-manual damage within warranty period. Continuous technical support available.