MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | T/T |
Supply Capacity: | 120-150 Sets Molds |
Product Name | P20 Material Laundry Tub SMC Mold Washing Tank Compression Moulding |
Product Material | SMC |
Core & Cavity Steel | 2316 |
Steel Hardness | HRC48-52 |
Mould Standard | DME |
Cavity Number | 1 |
Injection System | Direct gate |
Ejector System | Ejector plate |
Cycle Time | 40s |
Tooling Lead Time | 60 days |
Mould Life | 1,000,000 |
Quality Assurance | ISO9001 |
Taizhou Huangyan UTrust Mould Company is located in Huangyan, Zhejiang Province - known as the Hometown of Chinese Mould. With beautiful scenery and convenient transportation, we specialize in:
Supplier | Country | Steel Number |
---|---|---|
FINKL | USA | P20, H13 |
Assab | Sweden | S136, S136H, 718H |
DAIDO | Japan | NAK80, SKD61, PX5 |
Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
We have a professional QC team to control mold quality from raw material selection through machining to final mold testing. We understand that quality control is our top priority for successful business operations.
For most molds, normally 45 to 60 working days (excluding Chinese official holidays) after deposit received and mold drawings approved.
1) You can visit our factory to see mold testing directly.
2) We can send samples by courier (DHL, TNT, Fedex) and provide mold running videos and dimension inspection reports by email.
1 year warranty under normal use. Non-man made damaged spare parts will be provided free within one year. We're available for assistance at any time.
For any new SMC/BMC/GMT compression mould project, please send your 2D/3D drawing or sample picture with complete dimensions to us. We will respond promptly.
MOQ: | 1 Set |
Price: | $9000-$100000 |
Standard Packaging: | Wooden Case |
Delivery Period: | 45-60 days for mould |
Payment Method: | T/T |
Supply Capacity: | 120-150 Sets Molds |
Product Name | P20 Material Laundry Tub SMC Mold Washing Tank Compression Moulding |
Product Material | SMC |
Core & Cavity Steel | 2316 |
Steel Hardness | HRC48-52 |
Mould Standard | DME |
Cavity Number | 1 |
Injection System | Direct gate |
Ejector System | Ejector plate |
Cycle Time | 40s |
Tooling Lead Time | 60 days |
Mould Life | 1,000,000 |
Quality Assurance | ISO9001 |
Taizhou Huangyan UTrust Mould Company is located in Huangyan, Zhejiang Province - known as the Hometown of Chinese Mould. With beautiful scenery and convenient transportation, we specialize in:
Supplier | Country | Steel Number |
---|---|---|
FINKL | USA | P20, H13 |
Assab | Sweden | S136, S136H, 718H |
DAIDO | Japan | NAK80, SKD61, PX5 |
Buderus | Germany | 1.2311, 1.2312, 1.2343, 1.2738 |
We have a professional QC team to control mold quality from raw material selection through machining to final mold testing. We understand that quality control is our top priority for successful business operations.
For most molds, normally 45 to 60 working days (excluding Chinese official holidays) after deposit received and mold drawings approved.
1) You can visit our factory to see mold testing directly.
2) We can send samples by courier (DHL, TNT, Fedex) and provide mold running videos and dimension inspection reports by email.
1 year warranty under normal use. Non-man made damaged spare parts will be provided free within one year. We're available for assistance at any time.
For any new SMC/BMC/GMT compression mould project, please send your 2D/3D drawing or sample picture with complete dimensions to us. We will respond promptly.